
The installation and painting of the cabin of the A380 will be made in Hamburg
Took place on 20 October from Toulouse on first A380 maiden flight of Malaysia Airlines (BUT), after the completion of the final assembly and test system.
After a five-hour flight the aircraft is returned to Toulouse, to be prepared for the next flight, this time to the Airbus plant in Hamburg, in Germania, where the cabin will be installed and the painting will be done

With four Trent engines 900 di Rolls-Royce, the aircraft is the first of six A380 aircraft ordered by Malaysia Airlines, that will be delivered in the second quarter of 2012. Malaysia Airlines is the eighth airline to use the A380.
HH&A I engagement I relationships I experience